One of Building Services many current projects is to build a safe and secure pedestrian pathway between platform 1 and 2, at the northern end, via the road crossing. Jim Hitchen sent me a briefing of yesterday’s related activities :-
“We spent a lot of time in the yard at Winchcombe sorting out materials and loading the truck. 7 of us then went to Cheltenham to lay more of the brick wall, instal two gates and a length of fencing near the SB and start to clear the ground along the fence line on the P1 side. It is intended to put a 1.5m wide path along this fence for when P2 is brought into use and a full standard footpath needs to be provided between P2, over the crossing and up to P1.”
On the picture of the gates by the SB with the spirit level on top, shouldn’t the diagonal braces be the other way round?
LikeLike
You’re probably right but I wouldn’t want to be the one to tell them!!